ENGINEERED POWER DISTRIBUTION · CHINA
info@hjatis-power.comGlobal project support

APPLICATION CONTEXT

Power distribution for plants, utilities and infrastructure.

Find the equipment used in each application and the information needed to select it for your site.

Discuss an application →
Industrial manufacturing facility illustrating electrical distribution for process loads
01 / OPERATING CONTEXT
01

Manufacturing & process plants

Distribution systems must be considered against process continuity, motor starting, harmonics, maintainability and the cost of an unplanned shutdown.

01
Fault containment and selectivity
02
MCC and process interfaces
03
Expansion and maintenance access
Review industrial distribution equipment →
Engineers walking through a solar project site with electrical distribution equipment
02 / OPERATING CONTEXT
02

Renewable energy

Remote sites introduce collection voltage, environmental exposure, auxiliary power, grid-code interfaces and transport constraints that must be resolved as one package.

01
Collection and step-up architecture
02
Remote monitoring and auxiliary supply
03
Project-specific enclosure and logistics
Review renewable-energy systems →
Prefabricated electrical cabin installed at an outdoor utility and infrastructure project site
03 / OPERATING CONTEXT
03

Utilities & infrastructure

Network owners select equipment from the operating sequence, protection scheme, outage plan, service conditions and nominal system values.

01
Protection and control interfaces
02
Operating sequence and interlocks
03
Report applicability to the offered unit
Review medium-voltage systems →
HJATIS withdrawable low-voltage switchgear for redundant distribution in critical facilities
04 / OPERATING CONTEXT
04

Critical facilities

Hospitals, data-intensive facilities and essential services need clear segregation, redundancy, transfer sequences and a design-verification file for the offered assembly.

01
Service continuity and segregation
02
Transfer and backup connections
03
Assembly design and routine verification
Review final distribution equipment →

PROJECT INPUT

Send the load list, single-line diagram, fault level and site conditions.

Send project data →