
HJATIS TECHNICAL LIBRARY · 14 TECHNICAL ARTICLES
Technical notes for
electrical equipment buyers.
Equipment selection, transformer rooms, maintenance and delivery planning — with diagrams, comparison tables and questions to discuss with your supplier.

AI in EPC Equipment Procurement: Compare Bids and Control Costs
A practical approach to using AI to review switchgear, transformer and E-House bids: compare what is included, check cost adjustments and clarify delivery commitments.
Fanos | HJATIS · 9 September 2026 · 7 min read
Ring main unit or metal-clad switchgear for an 11 kV network?
Start with the feeder duties, protection scheme and maintenance plan. The network voltage alone will not select the switchgear arrangement.
HJATIS Power · 6 September 2026 · 5 min read
Dry-type transformer room ventilation: what to send with the layout
A useful room drawing shows where cooling air enters, where hot air leaves and which equipment produces heat. Start with the transformer loss data.
HJATIS Power · 6 September 2026 · 5 min read
Fixed or withdrawable LV switchboards: choose around maintenance
Decide how the plant will isolate, repair and restore a feeder before choosing the functional-unit arrangement.
HJATIS Power · 6 September 2026 · 5 min read
Comparing transformer quotations: no-load and load losses
Put the loss figures on the same test and operating basis before comparing two offers. Keep guaranteed values separate from estimates.
HJATIS Power · 6 September 2026 · 5 min read
E-House shipping splits: dimensions and access to settle before fabrication
Agree how the building will travel and be reassembled while the layout can still change. The delivery route belongs in the design discussion.
HJATIS Power · 6 September 2026 · 5 min read
GB/T 1094.11 and IEC 60076-11: checking a dry-type transformer report
Compare the tested transformer with the offered unit: ratings, enclosure, service conditions and the classifications specified for the project.
HJATIS Power · 27 August 2026 · 4 min read
GB/T 3906 and IEC 62271-200: the switchgear reports a buyer should compare
Check the tested panel, internal arc classification and service continuity category against the switchgear lineup offered for the project.
HJATIS Power · 27 August 2026 · 4 min read
IEC 61439 design verification for an assembled LV switchboard
Ask for the design-verification basis of the offered switchboard and the routine-verification record for each completed assembly.
HJATIS Power · 27 August 2026 · 3 min read
Does IEC 62271-202 cover the complete E-House? A buyer’s scope check
List the equipment inside the E-House, the building services and the site connections. Assign the applicable standards and documents to each part of the supply.
HJATIS Power · 27 August 2026 · 3 min read
What should an E-House FAT check before shipment?
Agree the test plan, check the installed equipment and test the protection, controls and auxiliaries together. Finish with signed results and a shipment punch list.
HJATIS Power · 27 August 2026 · 4 min read
Hot, humid, dusty or high-altitude site? E-House inputs to confirm before design
Give the design team measured site conditions and operating assumptions for insulation, cooling, filtration, corrosion protection and condensation control.
HJATIS Power · 27 August 2026 · 4 min read
E-House interface register: what to agree before approving drawings
Record who supplies, connects and checks the cables, earthing, control signals and building services before fabrication starts.
HJATIS Power · 27 August 2026 · 4 min read
FAT passed—what should buyers check after an E-House arrives on site?
Check transport condition, reassembly and site connections, then complete the agreed site tests and handover records.
HJATIS Power · 27 August 2026 · 4 min read